ASICMINER Water Cooling Row For Bitmain Antminer S19XPHydro
ASICMINER Water Cooling Row For Bitmain Antminer S19XPHydro
This is an independent air-water cooling device developed for water-cooled mining machines.
It is easy to install, just connect the water cooler with the air cooler, add coolant and it can run directly.
Regarding the noise situation, it can be controlled at about 40-50 decibels. Compared with the 80-90 decibels of the air-cooled mining machine, the noise can be reduced by 50%, which greatly alleviates the noise problem and is compatible with all water-cooled mining machines.
Parameters Model
Water cooling series-4.5KW | |
Capacity | ≈3L |
Power connector type | C14 socket*1; need to match C13 power cord/220V |
Power consumption | 4.5KW |
Quality (KG) | 14 |
Pipe diameter (MM) | Inlet and outlet water diameter 12MM (need to match the outer diameter of 12MM pipe) |
Product size | 94*53*22(CM) |
Cooling and heat dissipation temperature | 51.6℃ |
Speed range | 500-4500 |
Water cooling series-8KW | |
Capacity | ≈5L |
Power connector type | C14 socket*1; need to match C13 power cord/220V |
Power consumption | 8KW |
Quality (KG) | 13 |
Pipe diameter (MM) | Inlet and outlet water diameter 12MM (need to match the outer diameter of 12MM pipe) |
Product size | 66*52.5*16.5(CM) |
Cooling and heat dissipation temperature | 43.6℃ |
Speed range | 500-4500 |
Water cooling series-12KW | |
Capacity | ≈8L |
Power connector type | C14 socket*1; need to match C13 power cord/220V |
Power consumption | 12KW |
Pipe diameter (MM) | Inlet and outlet water diameter 16MM (need to match the outer diameter of 16MM pipe) |
Product Size | 94*50.3*22 |
Quality (KG) | 17 |
Speed range | 500-6000 |
The characteristics of Water Cooling Row
- Cool down and increase miner hash rate; air-cooled miners are usually prohibited from overclocking significantly due to the additional heat load generated by ASICs. However, miners using the water cooling row can safely overclock as they have better control over the PCB and die temperature of each ASIC. The extra heat load from overclocking will be quickly absorbed by the dielectric fluid and then quickly removed by the cooling system.
- Improve the reliability of the cooling system; under high-temperature environmental conditions, electronic equipment will generally overheat. It is one of the main reasons why electronic equipment malfunctions. However, reducing the temperature is a piece of cake for water cooling row. In addition, the water cooling row makes it completely isolated from the air and protected from harsh environments. Compared with air cooling, water cooling row eliminates the damage factors caused by humidity, dust and fan vibration to electronic equipment, and greatly improves the reliability of IT equipment.
- Easy to install, just connect the water cooler with the air cooler, add coolant and it can run directly.
- It can reduce the noise. The water cooling row is about 40-50 decibels. Compared with the 80-90 decibels of the air-cooled mining machine, the noise can be reduced by 50%, which greatly alleviates the noise trouble.
- Compatible with all water-cooing miners .
Contenido desplegable
DETAILS
Due to market fluctuations all sales are final. Please review our terms and conditions for additional details.In the unlikely event of a price change you will be notified by a member of our team. We will send an updated offer with which you will be able to decide if you would like to continue with the purchase or cancel. Most items are expected to ship within 5-8 work days depending on availability.
Second- Hand Product Warranty Period
some products have no warranty:We will test the machine and SN code to send video before shipment to ensure the normal use of the machine. We support online video, you can contact us by video call to watch the test, packaging and delivery of the machine in the video.
If your machine is damaged:
1. We provide online video guidance for technical engineers to solve machine failure problems;
2. We provide parts service at cost price
A variety of transportation methods are available
1. Global transportation. (Except for some countries and APO/FPO)
2. Process the order in time after confirming the payment.
3. We only ship to the confirmed order address. Your order address must match your shipping address.
4. The pictures shown are not actual products and are for reference only.
5. The service transit time is provided by the carrier, excluding weekends and holidays. Shipping time may vary, especially during holidays.
6. If you have not received the shipment within 30 days after payment, please contact us. We will track the shipment and get back to you as soon as possible. Our goal is to satisfy customers!
7. Due to the stock situation and time difference, we will choose to ship from our first available warehouse for fast delivery.
Sea, air and express